Damp Proofing & Tanking RAMS
DPC injection, tanking, waterproofing membranes, and rising damp treatment. Generate a professional, HSE-compliant risk assessment and method statement tailored to your specific project — in minutes, not hours.
Key Hazards Covered
Your Damp Proofing & Tanking RAMS will address these common hazards with detailed risk ratings and control measures.
Chemical exposure from injection fluids and sealants
Who's at risk: Operatives
COSHH assessment, RPE, chemical-resistant gloves, ventilation, SDS available
Dust from drilling into masonry
Who's at risk: Operatives
Dust extraction on drill, RPE (FFP3), wet methods where possible
Slip hazard from wet and treated surfaces
Who's at risk: Operatives
Non-slip footwear, clean as you go, warning signs
Working in confined basement spaces
Who's at risk: Operatives
Ventilation, gas monitor for old cellars, buddy system, access/egress plan
Method Statement Preview
Your generated RAMS will include a step-by-step method statement based on these core stages. The AI tailors each step to your specific project details.
Survey and diagnose source of damp
Remove affected plaster and finishes
Drill injection holes at DPC level
Inject damp proof course chemical
Apply tanking slurry or membrane
Allow curing time per specification
Re-plaster with salt-resistant render
Monitor and report completion
Required PPE
Personal Protective Equipment specified for damp proofing & tanking work. Your generated RAMS may include additional PPE based on your project details.
See What You'll Get
Every generated RAMS is a professional, print-ready document. Here's a preview of the PDF output for damp proofing & tanking work.
| Project Title | Damp Proofing & Tanking Works |
| Client / Principal Contractor | Your Client Name |
| Site Address | 123 Example Street, London |
| Expected Duration | 1-5 days |
| Hazard | L | S | Risk | Controls |
|---|---|---|---|---|
| Chemical exposure from injection fluids and sealants | 3 | 3 | Medium | COSHH assessment, RPE, chemical-resistant gloves, ventilation, SDS available |
| Dust from drilling into masonry | 4 | 3 | High | Dust extraction on drill, RPE (FFP3), wet methods where possible |
Survey and diagnose source of damp
This is what your Damp Proofing & Tanking RAMS looks like
Trusted by UK Contractors
How It Works
Three simple steps from template selection to professional RAMS document.
Select Your Template
Choose from 50+ job-specific templates. Each one is pre-loaded with relevant hazards, controls, and method statement steps.
Describe Your Project
Tell our AI about your specific project — location, scope, site conditions. The more detail you provide, the more tailored your RAMS.
AI Generates Your RAMS
In under 2 minutes, receive a professional, fully formatted RAMS document. Export as PDF or Word, ready for site use.
Generate Your Damp Proofing & Tanking RAMS in Minutes
Start with 2 free RAMS per month. Professional, HSE-compliant documents with risk assessments, method statements, and PPE requirements — ready for site use.
Related RAMS Templates
Explore more templates for similar trades and job types.
Frequently Asked Questions
Common questions about Damp Proofing & Tanking RAMS documents.