Extension Build RAMS
Single or double storey house extensions including foundations, structure, and fit-out. Generate a professional, HSE-compliant risk assessment and method statement tailored to your specific project — in minutes, not hours.
Key Hazards Covered
Your Extension Build RAMS will address these common hazards with detailed risk ratings and control measures.
Collapse of excavation for foundations
Who's at risk: Operatives
Trench support, battered sides, edge protection, no spoil near edge
Struck by plant or delivery vehicles
Who's at risk: Operatives, Public
Banksman, segregated pedestrian routes, delivery plan, hi-vis
Falls from scaffold or upper floor
Who's at risk: Operatives
Full scaffold with handrails, toe boards, scaffold inspections
Noise and vibration from construction plant
Who's at risk: Operatives, Neighbours
Hearing protection, HAV assessment, tool rotation, working hours restriction
Method Statement Preview
Your generated RAMS will include a step-by-step method statement based on these core stages. The AI tailors each step to your specific project details.
Set out foundations and excavate
Pour foundations and build up to DPC
Construct blockwork and brickwork walls
Install steels and lintels
Roof construction and weatherproofing
First fix services (plumbing, electrics, heating)
Insulation, plasterboard, and plastering
Second fix, flooring, and decoration
Required PPE
Personal Protective Equipment specified for extension build work. Your generated RAMS may include additional PPE based on your project details.
See What You'll Get
Every generated RAMS is a professional, print-ready document. Here's a preview of the PDF output for extension build work.
| Project Title | Extension Build Works |
| Client / Principal Contractor | Your Client Name |
| Site Address | 123 Example Street, London |
| Expected Duration | 6-12 weeks |
| Hazard | L | S | Risk | Controls |
|---|---|---|---|---|
| Collapse of excavation for foundations | 2 | 5 | Medium | Trench support, battered sides, edge protection, no spoil near edge |
| Struck by plant or delivery vehicles | 2 | 5 | Medium | Banksman, segregated pedestrian routes, delivery plan, hi-vis |
Set out foundations and excavate
This is what your Extension Build RAMS looks like
Trusted by UK Contractors
How It Works
Three simple steps from template selection to professional RAMS document.
Select Your Template
Choose from 50+ job-specific templates. Each one is pre-loaded with relevant hazards, controls, and method statement steps.
Describe Your Project
Tell our AI about your specific project — location, scope, site conditions. The more detail you provide, the more tailored your RAMS.
AI Generates Your RAMS
In under 2 minutes, receive a professional, fully formatted RAMS document. Export as PDF or Word, ready for site use.
Generate Your Extension Build RAMS in Minutes
Start with 2 free RAMS per month. Professional, HSE-compliant documents with risk assessments, method statements, and PPE requirements — ready for site use.
Related RAMS Templates
Explore more templates for similar trades and job types.
Frequently Asked Questions
Common questions about Extension Build RAMS documents.